Households in England and Wales continued to show strong interest in low-carbon heating in October 2026, when applications to the Boiler Upgrade Scheme reached a new monthly high. The latest official statistics were published on GOV.UK on 26 November 2026, and subsequent reporting on those figures shows that the record month came amid a continuing rise in interest in heat pumps. [1] [3] [4]
Record demand in October
The figures highlighted by Energy Live News and Octopus Energy show 14,286 households applied to the scheme in October 2026. Octopus Energy said that was 47% higher than in September 2026 and more than triple the level seen in October 2025. Those numbers point to a sharp and sustained increase in demand rather than a one-off jump. [3] [4]
The October result also sits within a broader upward trend. An earlier government release from 27 August 2026 said July 2026 applications reached 8,150, which was then a record. That means the later October peak followed a period of already rising demand through the summer and autumn. [2] [1] [3]
Where the scheme applies
The geography is important. The official guidance says the Boiler Upgrade Scheme is open to property owners in England and Wales. It is not presented in the guidance as a UK-wide grant, so readers in Scotland should not assume the same government scheme applies there under the same rules. [1] [5]
The guidance also sets out who can benefit from the grant and what it is worth. The standard heat pump grant is £7,500. Eligible off-grid oil or LPG homes can receive an increased £9,000 grant until 31 March 2027. That higher rate is the clearest sign in the official material that the scheme is designed to give extra help to the hardest-to-convert homes. [5]
The Boiler Upgrade Scheme supports eligible homes and non-domestic buildings in England and Wales. Small-business property owners should check the official eligibility rules for their building and proposed installation, rather than assume the scheme is limited to owner-occupied homes. [6]
What the official guidance says
The scheme’s current terms are straightforward in the guidance. The standard grant remains £7,500, and the uplift to £9,000 for eligible oil and LPG homes runs until 31 March 2027. Under the current guidance, those are the key policy facts to use when planning an application. [5]
That matters because strong demand does not change the basic eligibility rules. The latest figures show interest has grown quickly, but the guidance still limits the scheme to England and Wales and ties the grant to specific property types and installation requirements. Households should therefore check the official guidance rather than assume the headline number alone determines whether they qualify. [1] [5] [3]
Octopus Energy’s view of the surge
Octopus Energy said customer enquiries about the heat pump grant rose 73% in October 2026. That is a company-reported measure, not an official government count, but it adds to the picture of rising public interest in heat pumps and the Boiler Upgrade Scheme. [4]
The company also linked the higher level of applications to the wider rise in consumer interest. Its figures are best treated as a sign of market attention rather than a separate measure of government take-up, but they align with the official record month reported for October. [4] [3] [1]
Why the figures matter now
For households in England and Wales, the practical issue is timing. A record month for applications suggests more people are competing for installer attention and working through eligibility at the same time. The official figures do not say the scheme is closed; they show that demand has risen sharply and that interested households may want to move quickly if they are considering a heat pump. [1] [3] [4]
The higher £9,000 grant for eligible oil and LPG homes is especially relevant for off-grid properties, which can be among the most difficult homes to decarbonise. For those households, the current guidance offers a larger incentive until 31 March 2027. For everyone else within the scheme’s scope, the standard £7,500 remains the figure to work from. [5]
A record month, but not a new scheme
It is important not to confuse record demand with a change in the scheme itself. The official guidance still describes the existing grant structure, with the standard payment at £7,500 and the higher amount for eligible oil and LPG homes. The cited guidance does not announce a new nationwide policy replacing that framework. [5] [1]
What the October figures do show is that the scheme has become a prominent route for households considering heat pumps in England and Wales. The increase from the summer record in July to the new peak in October suggests the market has continued to build momentum, rather than settling after an initial burst of interest. [2] [1] [3]
The broader takeaway
The latest data point to a simple conclusion: demand for heat pump grants is rising strongly, and the official scheme remains available in England and Wales under its current rules. For households, that makes eligibility checks and planning more important. For policymakers, it shows that interest can grow quickly even when the scheme’s existing grant levels and deadlines remain unchanged. [1] [5] [3] [4]
For readers weighing up whether to apply, the clearest facts are the ones in the guidance. The Boiler Upgrade Scheme is open to property owners in England and Wales, the standard grant is £7,500, and eligible off-grid oil or LPG homes can receive £9,000 until 31 March 2027. Against that backdrop, October’s record application total is best understood as evidence of demand rising fast within a fixed policy framework. [5] [1] [3]
Sources
- GOV.UK / DESNZ – Boiler Upgrade Scheme statistics – GOV.UK (published 2026-11-26)
- GOV.UK / DESNZ – Record number of heating oil households apply for a heat pump (published 2026-08-27)
- Energy Live News – Heat pump demand hits a record – the same month the government cut the funding (published 2026-11-27)
- Octopus Energy – Heat pump grant applications hit record high as gas prices rise | Octopus Energy (published 2026-11-27)
- Ofgem – Boiler Upgrade Scheme: Product Eligibility List (published 2026-10-19)
- Ofgem – Boiler Upgrade Scheme Quarterly Report Issue 18 (published 2026-11-27)
Featured image: AI-generated conceptual illustration.



